Jump Main Menu. Go directly to the main content (Acces key S)

We use our own and third-party cookies to improve our services.If you continue to browse, we will assume that you consent to their use.You can obtain further information, or learn how to change the settings, in our cookies policy.

Close

Sección de idiomas

Language ESP | ENG

Fin de la sección de idiomas

2016 Full Year Results

  • Results posted: May 12th, at Market open (before 9:00 am CET)
  • Webcast: May 12th 13:00 pm CET

Stock Price

You are in:

  1. Business Areas
  2. Oil & Gas
  3. Upstream & Natural Gas
  4. NG, Liquefaction, Regasification & Storage

NG, Liquefaction, Regasification & Storage

Start of main content

 

TR's expertise in NG projects includes Liquefaction, Regasification, Tanks and associated facilities. From the safety point of view, these projects are particularly critical in all its phases. TR enjoys an excellent track record in safety; all the facilities designed and built by TR entered into operation and actually are operating without any safety event.

As a world-scale Contractor, TR provides comprehensive services within the natural gas field, ranging from consultancy jobs to turn-key contracting, including basic and detailed engineering, procurement, supply and transportation of equipment and materials or construction supervision and management.

NG projects contracting are one of the main business lines for TR. Activities in this field started in 1967 and TR has greatly contributed ever since to the development of high level natural gas infrastructure particularly in Spain, but as well in Latin America, China, and North Africa.

In 2002 TR heavily involved in the design and construction in one of TR’s most renowned projects; the NG Train 1 Damietta, (SEGAS) in Egypt. It was the largest single train facility at the time with the shortest schedule for a plant of this kind. Nowadays the plant is in commercial operation and recently TR signed a Pre FEED agreement for the tentative second train.

In 2010 TR was awarded its first NG project in the Far East, The Guangdong Zhuhai Golden Bay NG Tank and Terminal (CNOOC) in Zhuhai, China. The project includes the construction of 3 (three) NG tanks and NG terminal, which will transport 9 billion cu m/year of gas to 5 cities in Guangdong (Zhuhai, Zhongshan, Jiangmen, Foshan and Guangzhou).

TR has available the technology to give the client all the required means to design and build NG tanks, providing an integrated solution to NG Plants and Terminal.

In 2010 TR was awarded the Mejillones NG Tank Regasification Terminal in Chile (GNL Mejillones S.A.), which is a continuation of the first phase awarded to TR in 2007. TR will design and build an NG storage tank and connections to the NG terminal with a capacity of 175,000 m3 greater than any of the existing tanks in Spain.

TR signed in 2007 the EPC contract for the 5th NG Tank in Cartagena, which was successfully completed in 2010, which is a continuation to previously awarded phases to TR. In addition, TR has taken part in the design and construction of 4 out of 7 Regasification Terminals in Spain: Cartagena, Huelva and Barcelona for ENAGAS (European leading company in terms of regasification and storage capacity), and Bilbao for Bahía de Vizcaya.

TR has also performed several Basic Engineering and FEEDs for Regasification terminals such as: Gran Canaria & Tenerife (Canary Islands) NG Regasification Terminal for GASCAN, St. John (Canada) NG Regasification Terminal for Canaport, Bahia Cienfuegos (Cuba) NG Regasification Terminal for PDVSA, and Mejillones (Chile) NG Regasification Terminal for GNL Mejillones S.A.