Jump Main Menu. Go directly to the main content (Acces key S)

We use our own and third-party cookies to improve our services.If you continue to browse, we will assume that you consent to their use.You can obtain further information, or learn how to change the settings, in our cookies policy.

Close

Sección de idiomas

Language ESP | ENG

Fin de la sección de idiomas

2017 First Half results

Stock Price

You are in:

  1. Business Areas
  2. Oil & Gas
  3. Upstream & Natural Gas
  4. Oil and Gas Pipelines and Compressor Stations

Oil and Gas Pipelines and Compressor Stations

Start of main content

For more than 40 year now, TR Group provides services, executing Projects and building Installations in the field of Oil and Gas Pipelines, Onshore and Offshore, and related facilities including:

  • Oil and Gas Pipelines.
  • Oil and Gas Gathering Systems.
  • Pump Stations.
  • Compressor Stations.
  • Meter Stations.
  • Oil and Gas Terminals.
  • Oil and Gas Storage.
  • Underground Gas Storage.

More than 80% of the Oil and Gas pipelines of the Spanish national network have been designed by the TR Group.

Additionally, TR provides full range of Services for Oil and Gas Pipelines, Compressor/ Pumping stations, Control and Metering systems, from concept stage to operation, including:

  • Project Management.
  • Health, Safety and Environmental Management.
  • Front End Engineering Design.
  • Permitting.
  • Detailed Engineering and Hazop Studies.
  • EIA and QRA Management.
  • Procurement, Inspection and Expediting of Materials and Equipment.
  • Quality Assurance and Quality Control.
  • Project Cost Control & Planning.
  • Construction Supervision.
  • Commissioning.
  • Start-Up assistance.

TR recently completed the Saih Rawl Depletion Compression Project, a contract signed in 2007 between the Petroleum Development Oman (PDO) and TR Oman for the engineering, procurement and construction of the facilities for this project. The project consisted of a 120MW power station, a state-of-the-art plant containing 4 electric gas-compression trains, and the installation of a power distribution system connecting the Saih Rawl area with Qarn Alam and Saih Nihayda.

TR also recently completed a number of projects in Algeria. In 2006 Medgaz awarded the Compressor Station and Receiving Terminal to TR (consortium Amec Spie) located near the coastal town of Beni-Saf (Algeria). With a surface area of 150,000 m2, the Compressor Station will raise natural gas pressure from the gigantic Hassi R'Mel fields so that the gas can then be transported to Spain. The Receiving Terminal, situated on the coast of Almeria, will receive, filter, regulate and measure the natural gas originating from Beni -Saf, and will subsequently deliver it to the Spanish gas grid.

TR recently completed the RKF Compression Station project, a contract signed in 2006 between the Sonatrach-Cepsa and TR. The project, located at Rhourde El Khrouf (Algeria), consisted of an 8MW gas compression station, a state-of-the-art plant, including 2 reciprocating three stages compressors of 4MW each.

Furthermore, TR recently completed the TFT (Phase II) Compression Station Project, a contract signed in 2006 between the Sonatrach -Total - Repsol and TR. The project, located at Tin Fouyé Tabankourt Compression Station (Algeria), consisted of a 50MW gas compression station, a state-of-the-art plant, including 2 centrifugal turbocompressors of 25MW each.

TR recently completed the Navarra Compression Station Project, a contract signed in 2007 between the Sonatrach -Total - Repsol and TR. The project, located at Navarra (Spain), consisted of a 37.2MW gas compression station, a state-of-the-art plant, including 2 centrifugal turbo compressors of 18.6MW each.

End of main content